Feature · Verified Construction Progress

Reported progress is not verified progress

A percentage typed into a daily report is a claim. Verified Construction Progress checks every work package against the evidence that should exist for it — measurement, photos, quality tests, curing logs, drawing revisions and approvals — and tells the project manager and the client what is proven, what needs action and what cannot be judged yet.

Built · in controlled pilot rollout: installed in production and switched on project by project after qualification.

Six facts, kept apart

Sampraxis never collapses progress into one number. For every work package it keeps six separate facts, each with its own owner and evidence: reported (what the site team entered), measured (the Measurement Book), accepted (technical or consultant acceptance), certified (the commercial certification on a claim), billed and paid. A daily report never certifies completion; site measurement never rewrites the drawing quantity; quality acceptance never authorises payment.

What a work package is checked against

  • Tasks and the approved estimate baseline, so progress is weighted by approved value, never by task count.
  • Daily progress reports, labour and material entries, and photos.
  • Measurement Book entries with their dimensions and drawing references.
  • Quality inspections, concrete cube tests and soil tests.
  • Curing entries and daily curing logs.
  • Drawings, revisions and the drawing register; RFI, RFC and TQ queries.
  • Task approval gates, GRNs, purchase orders and difference notices.
  • Earned value and variance.

Each project runs an evidence profile that says which of these sources a work type needs. A source the profile does not require is not applicable; a source that should exist but is missing, stale or unavailable makes the package not evaluable.

Five statuses, in words

GreenRequired proof is applicable, available, fresh, aligned and passed.
AmberProgress exists, but proof, variance, a decision or freshness needs action.
RedA deterministic failure, blocker, rejection, over-use or unresolved NCR.
Not evaluableRequired truth is unavailable or unproven. Missing evidence is never shown as green.
Not applicableThe project's approved profile does not require this source.

Every result carries the date its data was read, the time it was computed, a freshness status and the rule version that produced it, so two people looking at the same package see the same reasons.

Who sees what

Project managers see the full internal evidence and every reason. Site and store roles see execution, material, quality and blocker facts. Consultants see their discipline's evidence and decisions. Accountants see certified quantities and payment readiness. Clients see an approved, redacted summary: the Progress Confidence Report is built from the already-redacted view, never from internal rows filtered on screen.

AI cites. It never decides.

The source-cited Copilot can explain a status, name the evidence behind it, say how fresh that evidence is and which rule version applied. It cannot approve a drawing, certify work, release a task, create a deduction, post accounts or pay anyone. Those stay with the people allowed to do them.

Frequently asked questions

Does a red or amber status stop work on site?

No. A confidence status is an explainable trust warning. Only an existing engineering guard, such as an unaccepted drawing change or a curing period that is not complete, can block a task. The status tells you why trust is low and who owns the fix.

What happens when evidence is simply missing?

The package is shown as not evaluable, with the missing source named. Missing or stale evidence is never shown as green.

Can the AI change a status?

No. Statuses come from deterministic rules with a version number. The Copilot can explain a status and cite the evidence behind it, but it cannot approve, certify, deduct, post or pay.

When can my firm use it?

The layer is built, tested and installed in production, but dormant. It is switched on per project and per rule, from observe to advisory to approval-assist to enforced, after qualification. Early-access firms will be the first to pilot it.

Sampraxis CAD · Limited Test Demo Preview

Register for Preview

Register for the Sampraxis CAD limited test demo preview. We review registrations and email selected participants a download link and access instructions. Registration does not guarantee access.

Talk to us

Questions about your projects, a pilot, or how Sampraxis would fit your firm? Write to sam@sampraxis.com.