Skip to content
Sampraxis Technologies
Menu

Feature · Drawings & coordination

Questions, decisions and minutes that close

Requests for information, requests for change and technical queries are raised against drawings and tasks and answered on record; meeting minutes carry owned, dated actions; and a decision register shows what was decided and what closed it. An unaccepted change blocks the work it affects.

Queries and the drawing register: live in the private beta. Coordination hub, meeting minutes and decision register: built, in pilot rollout.

RFI, RFC and TQ

A query is raised against a drawing, a revision or a task, with photos where they help. Consultants respond; the project manager accepts or escalates. The lifecycle is explicit — open, responded, accepted or closed — and an unaccepted request for change keeps the affected task blocked, because an answer that nobody accepted is not a decision anyone is liable for.

Meeting minutes with owned actions

  • Each minute item has an owner, a role, a due date and a status.
  • Actions link to the task, drawing, revision, query, change or certificate they concern.
  • Closing an action records the evidence that closed it.
  • Items can be marked client-visible with a client-safe summary.

The coordination hub

One screen per project for what needs a decision: open queries by discipline, drawing revisions awaiting approval, actions past their date and decisions taken this period. It reads from the same records as the confidence layer, so a blocker shown here is the same blocker that keeps a work package amber.

Frequently asked questions

Does an answered query unblock the task?

No. An answer is advice on record; the task is released when the response is accepted, or when a project manager records an audited override. Closing a query without acceptance does not unblock anything.

Can the client see queries and minutes?

Only what is marked client-visible, with a client-safe summary written for it. Internal discussion stays internal.

What is a decision register?

A list of the decisions taken on drawings, queries and meetings, each with who took it, when, what it affects and the evidence that closed it, so a site conversation six months later has a record to point at.

Sampraxis CAD · Limited Test Demo Preview

Register for Preview

Register for the Sampraxis CAD limited test demo preview. We review registrations and email selected participants a download link and access instructions. Registration does not guarantee access.

Talk to us

Questions about your projects, a pilot, or how Sampraxis would fit your firm? Write to sam@sampraxis.com.

Interested in

Only Sampraxis CAD preview registration is open. Project Management registration is not open yet.

We use these details only to contact you about early access and pilots. See the privacy policy.