Quality inspections
Log an inspection with its type, a description of what was checked, the date, who inspected it and the result. The project’s inspections stay in one list, newest first, so the history of a slab or a wall is easy to find.
Concrete cube tests against the target
For each test, record the slab or element, the cast date and the test date, the lab name and its reference number, and the actual strength in MPa. Each result is compared with its target, and the target’s basis and reference are recorded with it, so a low result is visible against the specification it failed.
A curing tracker that follows the pour
When a DPR records work that needs curing, the curing tracker opens an entry for it. For every curing day the site team records it as done, with photos. The tracker shows the required days, the days with evidence and any missing days, and completion is approved at the end.
- Each entry shows whether the DPR that started it has been approved.
- Photos can be taken in the app or added from the gallery.
- Consultant gates still pending are listed on the entry.