From the drawing to an approved number every later day answers to

Quantities are taken off approved drawings line by line, priced through rate books with their analysis, assembled into a working estimate, and frozen as an approved baseline that is allocated to tasks. Every figure keeps its source, its version and who approved it.

Built · in pilot rollout. The setup-wizard BOQ and rate import are live in the private beta.

Design QTO

A quantity take-off package belongs to a project and a set of drawing revisions. Each line records the formula type, length, breadth and depth or a direct quantity, the unit it was entered in and the normalised quantity, the work type and location, and whether it adds or deducts. Versions are compared against the approved one, so a revision shows exactly which lines, deductions and sources changed before anyone approves it.

Rates and rate analysis

Rate books hold your rates in immutable versions. A rate can be a figure or a recipe: material, labour and plant lines with coefficients, wastage percentages and cost buckets that reproduce the rate exactly. Legacy rate sheets can be imported as drafts and reviewed before they become a version.

Working estimation and the approved baseline

  • Estimate lines combine QTO quantities with rate-book rates; a source-impact preview shows what a changed quantity or rate does before you accept it.
  • Submit, request changes, reject or approve: approval produces an immutable baseline with its own revision number.
  • Compare any working estimate with the approved baseline, and export the lines as CSV.

Planned cost allocation

The approved value is allocated to tasks and subtasks explicitly. Sampraxis never spreads a budget equally across tasks to fill a gap: a positive unallocated value is rejected by the database and the screen alike. The allocation is what earned value, variance and the confidence engine weight progress by.

Frequently asked questions

Does Sampraxis suggest market rates?

No, and it never will. Rates are entered by your estimator or project manager, with the analysis that justifies them. Sampraxis calculates; it does not judge your prices.

What happens when a drawing is revised?

A new QTO version is prepared against the new revision and compared with the approved one: changed quantities, changed deductions and changed sources are listed. The approved baseline does not move until someone with authority approves the change.

How does this relate to the BOQ tab in project setup?

The existing setup chain (measurements → BOQ → rates → activate) is live in the private beta. The QTO, rate-book and estimation authorities are the versioned, approval-controlled replacement being rolled out behind it, project by project.

Will Sampraxis CAD feed the QTO?

That is the plan: the approved quantities from Sampraxis CAD become the Design QTO, and a drawing revision arrives as a difference to approve. The exchange between the two products is in development.

Sampraxis CAD · Limited Test Demo Preview

Register for Preview

Register for the Sampraxis CAD limited test demo preview. We review registrations and email selected participants a download link and access instructions. Registration does not guarantee access.

Talk to us

Questions about your projects, a pilot, or how Sampraxis would fit your firm? Write to sam@sampraxis.com.

Interested in

Only Sampraxis CAD preview registration is open. Project Management registration is not open yet.

We use these details only to contact you about early access and pilots. See the privacy policy.