Construction scheduling with Gantt, S-curve and EVM

Plan the job as tasks on a Gantt chart, freeze a baseline and track progress against it. Sampraxis draws the S-curve of planned against actual progress and works out earned value measures — CPI, SPI, estimate at completion — so a project that is slipping on time or cost shows up early. It is for contractors, PMCs and builders who report progress to a client or a board.

Launching soon: part of Sampraxis Project Management, which opens to early-access firms first.

A Gantt chart for construction scheduling

Break the project into tasks with durations and dependencies — foundation before plinth, slab before blockwork — and see them on a Gantt chart. If the schedule already exists in Excel, import it rather than typing it again.

Baselines

A baseline freezes the plan as agreed. Progress is then measured against it, and when the scope or dates change you save a new baseline without losing the earlier ones. That history matters when a client asks why the handover moved.

S-curve: planned against actual

The S-curve plots cumulative planned progress against cumulative actual progress over time. When the actual line falls below the planned one, the gap is the delay — visible weeks before it becomes a missed milestone.

Earned value in plain terms

Earned value turns progress and cost into a few numbers you can act on:

MeasureWhat it tells you
CPI (cost performance index)Value of work done for every rupee spent. Below 1.0 means over budget.
SPI (schedule performance index)Work done compared with work planned by now. Below 1.0 means behind schedule.
EAC (estimate at completion)What the project is likely to cost at the end if the current trend holds.
VAC (variance at completion)The expected overrun or saving against the budget.

Actual cost comes straight from the accounts, because bills and payments post as they happen — see construction accounting.

Progress from site, every day

Site engineers record work done in the daily progress report on their phone. That progress is what the S-curve and earned value are calculated from, so the office is not waiting for a weekly spreadsheet.

Frequently asked questions

What is earned value management (EVM)?

EVM compares three numbers: the value of work planned to date (PV), the value of work actually done (EV) and what it actually cost (AC). From them come the cost and schedule performance indices, CPI = EV ÷ AC and SPI = EV ÷ PV. Below 1.0 means over budget or behind schedule.

What is an S-curve in construction?

A graph of cumulative progress or cost against time. Planned progress usually starts slowly, speeds up in the middle of the job and flattens at the end, which gives the S shape. Plotting actual progress on the same graph shows at a glance whether the job is ahead or behind.

Can I import my schedule from Excel?

Yes. A task schedule in an Excel (.xlsx) sheet can be imported as the Gantt chart instead of entering each task by hand.

Do I need Primavera or MS Project?

No. The Gantt chart, baselines and earned value are built in. Keep using a dedicated planning tool if your client asks for one; Sampraxis is where site progress and cost meet the plan.

Can I re-baseline when the scope changes?

Yes. You can save a new baseline and keep the earlier ones, so a revised plan does not erase the original.

Sampraxis CAD · Limited Test Demo Preview

Register for Preview

Register for the Sampraxis CAD limited test demo preview. We review registrations and email selected participants a download link and access instructions. Registration does not guarantee access.

Talk to us

Questions about your projects, a pilot, or how Sampraxis would fit your firm? Write to sam@sampraxis.com.

Interested in

Only Sampraxis CAD preview registration is open. Project Management registration is not open yet.

We use these details only to contact you about early access and pilots. See the privacy policy.